Abstract
A technique of super-bunch acceleration with high repetition induction accelerators and an accumulator ring (AR) are required for the upgrade of the 12 GeV proton synchrotron at KEK. A fast dynamic switching of 3 kV flip-flop pulses was performed at 200 kHz with SI-thyristors, to confirm a barrier bucket scheme for induction acceleration finally. On the other hand, a model permanent gradient magnet for the AR was assembled to investigate its field quality, a temperature dependence and its compensation.
Original language | English |
---|---|
Pages | 3287-3289 |
Number of pages | 3 |
Publication status | Published - Dec 1 2001 |
Event | 2001 Particle Accelerator Conference - Chicago, IL, United States Duration: Jun 18 2001 → Jun 22 2001 |
Other
Other | 2001 Particle Accelerator Conference |
---|---|
Country/Territory | United States |
City | Chicago, IL |
Period | 6/18/01 → 6/22/01 |
ASJC Scopus subject areas
- Engineering(all)