Abstract
One of the important thing in the mitigation of accidents in nuclear power plant accidents is time management. The accidents should be resolved as soon as possible in order to prevent the core melting and the release of radioactive material to the environment. In this case, operators should follow the emergency operating procedure related with the accident, in step by step order and in allowable time. Nowadays, the advanced main control rooms are equipped with computer-based procedures (CBPs) which is make it easier for operators to do their tasks of monitoring and controlling the reactor. However, most of the CBPs do not include the time remaining display feature which informs operators of time available for them to execute procedure steps and warns them if the they reach the time limit. Furthermore, the feature will increase the awareness of operators about their current situation in the procedure. This paper investigates this issue. The simplified of emergency operating procedure (EOP) of steam generator tube rupture (SGTR) accident of PWR plant is applied. In addition, the sequence of actions on each step of the procedure is modelled using multilevel flow modelling (MFM) and influenced propagation rule. The prediction of action time on each step is acquired based on similar case accidents and the Support Vector Regression. The derived time will be processed and then displayed on a CBP user interface.
Original language | English |
---|---|
Article number | 012008 |
Journal | Journal of Physics: Conference Series |
Volume | 962 |
Issue number | 1 |
DOIs | |
Publication status | Published - Mar 16 2018 |
Event | 2nd International Conference on Nuclear Technologies and Sciences, ICoNETS 2017 - Makassar, Indonesia Duration: Oct 12 2017 → Oct 13 2017 |
Keywords
- PWR type reactor
- computer-based procedure
- multilevel flow modelling
- steam generator tube rupture
- support vector regression
- time remaining
ASJC Scopus subject areas
- General Physics and Astronomy