Abstract
In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.
Original language | English |
---|---|
Pages (from-to) | 565-573 |
Number of pages | 9 |
Journal | International Journal of Production Economics |
Volume | 60 |
DOIs | |
Publication status | Published - Apr 20 1999 |
Event | Proceedings of the 1997 14th International Conference on Production Research, ICPR-97 - Osaka, Jpn Duration: Aug 4 1997 → Aug 8 1997 |