抄録
In tunnel constructions, heterogeneity of rock bodies such as faults and related fracture zones can be serious problem for safety management, construction planning and excavation costs. Thus, the estimate of geological conditions and rock properties ahead of the tunnel faces is strongly required and several methods of such fore survey have been proposed by many researchers. For this purpose, we have developed "DRISS", the Drilling Survey System, for fore surveys at tunnel faces with higher accuracy, and report here the application of this system to tunnel construction sites. In this paper, we outline our fore survey system, and show the successful fore survey results including the improvement in drilling techniques at the tunnel construction site with soft rocks.
| 本文言語 | English |
|---|---|
| ページ(範囲) | 494-499 |
| ページ数 | 6 |
| ジャーナル | Zairyo/Journal of the Society of Materials Science, Japan |
| 巻 | 52 |
| 号 | 5 |
| DOI | |
| 出版ステータス | Published - 5月 2003 |
| 外部発表 | はい |
ASJC Scopus subject areas
- 材料科学一般
- 凝縮系物理学
- 材料力学
- 機械工学
フィンガープリント
「Application of drilling survey system for soft rock」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。引用スタイル
- APA
- Standard
- Harvard
- Vancouver
- Author
- BIBTEX
- RIS