抄録
During the summer shutdown of 2003, the new silicon vertex detector SVD2 was installed in Belle at the KERB factory and started to take data in October 2003. It provides important improvements in the tracking capabilities and adds new trigger functionality. In addition, a new hardware trigger Level 1.5 was designed and installed that takes advantage of the digitized SVD hit data. The improvement in the Belle trigger system will be important to deal with the increasing luminosity and higher beam currents of the KEKB factory.
本文言語 | English |
---|---|
ページ(範囲) | 1852-1856 |
ページ数 | 5 |
ジャーナル | IEEE Transactions on Nuclear Science |
巻 | 51 |
号 | 4 I |
DOI | |
出版ステータス | Published - 8月 2004 |
外部発表 | はい |
ASJC Scopus subject areas
- 核物理学および高エネルギー物理学
- 原子力エネルギーおよび原子力工学
- 電子工学および電気工学